Home
Inventory
Power Plant
Steam Turbine
Generator
About Us
Contact Us
Call Support
+353871851869
Email Address
cmakbar@thermalpowerltd.com
Home
Inventory
Power Plant
Steam Turbine
Generator
About Us
Contact Us
Home
Search Results
- in
More filters
{{ props.count }}
Results
Sort by:
Clear all
5 MW STG Condensing/Extraction
5 MW Steam Turbine Generator Cond/Extr in Germany
5 MW Steam Turbine Generator
The FLUIDIZED BED BOILER R.O.Plant and H.P Compressor
BFB Boiler K7
1 & 11.6 MW Steam Turbines Generator
The attached Boilers are 50 bar can run on 40 bar very easily with out any loss OR amendment with also can as per your required capacity on solid fuel with chain moving grade only 6 months run, installed and only 6 month runs
FLUEDIZED BED BOILER. 75 t/h, 65 bar, 525°C Bird Waste/ Coal/Baggas Firing/Natural Gas with Fluedized Bed, Water Tube Boilers, Kymi Kymmene
No Photo
PowerPlant
No Photo
Power Plant: BFB-Boiler Solid Fuel Fire Boiler Chain Moving Grade, Babcock 1982, 70 T/h, 106 Bar, 505C, With EPC
High Pressure Compressor
Boiler
Steam Turbine Generator (Condensing/ Back Pressure/ Cond(Extrauction)
BFB Boiler K7 – Flue Gas Treatment
BFB Boiler K7 sktc wnl cun ture ISiC leo
No Photo
turbineeee
Steam Turbine
Showing
{{ pagination.startIndex + 1 >= 0 ? pagination.startIndex + 1 : 0 }}
to
{{ pagination.endIndex + 1 }}
of
{{ pagination.totalItems }}
results
1
...
{{ page }}
Showing
{{ pagination.startIndex + 1 }}
to
{{ pagination.endIndex + 1 }}
of
{{ pagination.totalItems }}
results
1
...
{{ page }}
+353871851869
Rua Almada Negeiros Lot 5, Loja 14, 2615-275, Alverca, Portugal255 Moseley Road, M19 2LJ, Manchester, U.K.
cmakbar@thermalpowerltd.com
Navigation
Home
Inventory
About Us
Contact Us
Newest Listings
© 2024 Thermal Power LTD. All rights reserved.
Field is required
Username must have at least 1 letters.
Field is required
Password must have at least 6 letters.
Remember me
Forgot password?
Login
Forgot password?